Submission incomplete:
1: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
The DOE is requested to provide further information on how it validated Option 2 of Annex 2 (ACM0012 ver.4) in line with CL 16 of the Validation Report.

2: The DOE is requested to state if the methodology provides different options for equations and parameters and if the selection is appropriate as per VVM v1.2 paragraph 90.
The DOE is requested to clarify the calculation of QOE,BL using Method 3 (Case 1). In doing so the DOE should note that ACM0012 ver 4 states that "fcap should be the ratio of maximum energy that could be recovered (MER) by the waste heat recovery equipment implemented under the CDM project activity and the actual energy recovered under the project activity (using direct measurement)."