Info Report Check
Submission incomplete:
The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
The PDD and validation report indicate that the turbine and generator installed, as part of the proposed activity, are second hand equipment. Therefore, the DOE should include in the validation report an assessment on how it has validated that the proposed project activity is in line with the following applicability condition of the methodology ACM0018 v1.2 guidance :"The installation of new biomass residues (co-)fired power-only plants, which replace or are operated next to existing power-only plants fired with fossil fuels and/or biomass residues (power capacity expansion projects)"
The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
The PDD and validation report indicate that the turbine and generator installed, as part of the proposed activity, are second hand equipment. Therefore, the DOE should include in the validation report an assessment on how it has validated that the proposed project activity is in line with the following applicability condition of the methodology ACM0018 v1.2 guidance :"The installation of new biomass residues (co-)fired power-only plants, which replace or are operated next to existing power-only plants fired with fossil fuels and/or biomass residues (power capacity expansion projects)"

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: