Submission incomplete:
1: The PP/DOE are requested to describe the procedure taken to demonstrate additionality of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The description of method applied to demonstrate the additionality is not consistent given that barrier analysis was mentioned in page 18 &19 of the PDD whereas investment analysis was conducted in B.5 section of the PDD.
2: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The DOE shall explain why the supplementary electricity consumption of the project activity (e.g. auxiliary electricity consumption) has not been considered in the monitoring plan
3: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
(a). The DOE shall explain how it has validated the applicability of the selected methodology to the project activity, instead of simply confirming the compliance.
(b). The DOE shall explain how it has validated the extent of use of waste energy from the waste energy generation facility in the absence of the CDM project activity, in particular, how it has validated that the project participants are not able to arrive at five facilities of similar type as the greenfield project facility. In doing so, please also specify: (i) the criteria applied to identify the existing facilities as per ACM0012 version 4, Annex 1, Option 1, paragraph 1; and (ii) the information sources as per ACM0012 version 4, Annex 1, Option 1, paragraph 2. If five facilities can be arrived, please validate the baseline emissions practice factor (f practice) as per ACM0012 version 4, Annex 1, Option 1.
4: The DOE is requested to state if the methodology provides different options for equations and parameters and if the selection is appropriate as per VVM v1.2 paragraph 90.
The DOE shall explain how it has validated applicability of Case-1 of Method-3 given that an intermediate energy recovery equipment (waste heat recovery boiler)/source (water/steam) are involved in the project activity.
5: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE shall justify the appropriateness of including sales tax into investment analysis.
6: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
(a) The DOE shall explain how it has validate the suitability of the total investment. In doing so, please provide a breakdown of the total investment and the justification on each component. In addition, please: (i) explain how it has confirmed that the documentation examined is relevant to the project activity; (ii) specify the information on the documentations validated, including the title, date and related parties; and (iii) specify the information on the contracts validated, including the title, date and related parties;
(b) The DOE shall explain how it has validated the suitability of O&M costs, in particular: (i) how the report "Actual O&M cost of the project at Sichuan Emeishan Foguang Cement Co., Ltd. from December 2010 to February 2011" was derived; (ii) how it has validated that the actual cost of each component of O&M costs is solely related to the project activity; (iii) the suitability of determining annual cost based on 3-month data (December 2010 to February 2011); and (iv) it is not clear whether the DOE has validated the actual Other Expenses given that the explanations in page 29 of the validation report are not consistent ("other expenses per year were expected to be 5,940,000RMB" vs. According to the actual expenses..."). In doing so. please also provide the detailed information on the report "Actual O&M cost of the project at Sichuan Emeishan Foguang Cement Co., Ltd. from December 2010 to February 2011", including date and author etc;
(c) The described total investment (199,800,400 RMB) and installed capacity (23MW) of the project activity in page 34 of validation report is not consist with other parts of the validation report.
1: The PP/DOE are requested to describe the procedure taken to demonstrate additionality of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The description of method applied to demonstrate the additionality is not consistent given that barrier analysis was mentioned in page 18 &19 of the PDD whereas investment analysis was conducted in B.5 section of the PDD.
2: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The DOE shall explain why the supplementary electricity consumption of the project activity (e.g. auxiliary electricity consumption) has not been considered in the monitoring plan
3: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
(a). The DOE shall explain how it has validated the applicability of the selected methodology to the project activity, instead of simply confirming the compliance.
(b). The DOE shall explain how it has validated the extent of use of waste energy from the waste energy generation facility in the absence of the CDM project activity, in particular, how it has validated that the project participants are not able to arrive at five facilities of similar type as the greenfield project facility. In doing so, please also specify: (i) the criteria applied to identify the existing facilities as per ACM0012 version 4, Annex 1, Option 1, paragraph 1; and (ii) the information sources as per ACM0012 version 4, Annex 1, Option 1, paragraph 2. If five facilities can be arrived, please validate the baseline emissions practice factor (f practice) as per ACM0012 version 4, Annex 1, Option 1.
4: The DOE is requested to state if the methodology provides different options for equations and parameters and if the selection is appropriate as per VVM v1.2 paragraph 90.
The DOE shall explain how it has validated applicability of Case-1 of Method-3 given that an intermediate energy recovery equipment (waste heat recovery boiler)/source (water/steam) are involved in the project activity.
5: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE shall justify the appropriateness of including sales tax into investment analysis.
6: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
(a) The DOE shall explain how it has validate the suitability of the total investment. In doing so, please provide a breakdown of the total investment and the justification on each component. In addition, please: (i) explain how it has confirmed that the documentation examined is relevant to the project activity; (ii) specify the information on the documentations validated, including the title, date and related parties; and (iii) specify the information on the contracts validated, including the title, date and related parties;
(b) The DOE shall explain how it has validated the suitability of O&M costs, in particular: (i) how the report "Actual O&M cost of the project at Sichuan Emeishan Foguang Cement Co., Ltd. from December 2010 to February 2011" was derived; (ii) how it has validated that the actual cost of each component of O&M costs is solely related to the project activity; (iii) the suitability of determining annual cost based on 3-month data (December 2010 to February 2011); and (iv) it is not clear whether the DOE has validated the actual Other Expenses given that the explanations in page 29 of the validation report are not consistent ("other expenses per year were expected to be 5,940,000RMB" vs. According to the actual expenses..."). In doing so. please also provide the detailed information on the report "Actual O&M cost of the project at Sichuan Emeishan Foguang Cement Co., Ltd. from December 2010 to February 2011", including date and author etc;
(c) The described total investment (199,800,400 RMB) and installed capacity (23MW) of the project activity in page 34 of validation report is not consist with other parts of the validation report.