01:44 09 Oct 24
Info Report Check
Submission incomplete:
1: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to provide validation opinion on (a) the input parameters used to calculate the diesel and crude oil required for electricity generation in block 15 and 31 such as diesel oil electricity generation potential and crude oil electricity generation potential and; (b) the requirement of AM0009 version 5.0.1 (page 6 & 10) which states that "the validating DOE shall confirm that estimated emission reductions reported in the CDM-PDD are based on estimates provided in the survey used for defining the terms of the underlying oil production project as per the production sharing contract."
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The DOE is requested to further verify the monitoring frequency of the monitoring parameter - average NCV value of recovered gas measured at point F, (NCVRG,F,y) in accordance with AM0009 version 5.0.1
1: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to provide validation opinion on (a) the input parameters used to calculate the diesel and crude oil required for electricity generation in block 15 and 31 such as diesel oil electricity generation potential and crude oil electricity generation potential and; (b) the requirement of AM0009 version 5.0.1 (page 6 & 10) which states that "the validating DOE shall confirm that estimated emission reductions reported in the CDM-PDD are based on estimates provided in the survey used for defining the terms of the underlying oil production project as per the production sharing contract."
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The DOE is requested to further verify the monitoring frequency of the monitoring parameter - average NCV value of recovered gas measured at point F, (NCVRG,F,y) in accordance with AM0009 version 5.0.1
Offset now: visit the United Nations Carbon Offset Platform