Info Report Check
Submission incomplete:
1: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
In page 38 of the VR, the DOE explains that details of the data to be
collected, (....) QA/QC procedures, procedures for calibration of metering
equipment and procedures for training and maintenance have been elaborated
in the monitoring plan in the PDD.

However, the PDD does not provide the mentioned details. In page 42 of the
PDD, it is mentioned the following:

- the accuracy and frequency of calibration of meters is established by the
manufacturer's specifications. (...) The metering arrangements and the
required quality control procedures to ensure accuracy are defined between
the Project developer and the power utility. The precission class,
requirements for meters and metering transformers, data recording and
communication system, commissioning and periodic testing of the metering
system, would be agreed between the project developer and the power
utility.

Hence, the DOE is requested to provide information on how it assessed that
the means of implementation of the MP are sufficient to ensure that the ER
achieved can be reported ex post and verified.



2: The DOE is requested to include appointment certificate or CV of each validation team member as per VVM v 1.2 paragraph 174 (g).