Info Report Check
Submission incomplete:
1: The PP/DOE are requested to complete all sections of the PDD related to the description of the project activity as per PS version 9 paragraphs 31.
The PP/DOE while responding to Issue No.6 raised during the information and reporting check for the previous submission mentioned that the project activity will include a fossil fuel based boiler as stand by for start up and shut downs of CHP. However in response to Issue-3 the DOE mentioned that there will be no fossil fuel combustion in the project activity. The PP/DOE shall address the inconsistency and reflect the correct information in the project description and the schematic diagram of the PDD.

2: The DOE is requested to describe how it has validated the compliance of the monitoring plan with the applied methodology(ies) as per VVS version 9 paragraph 386 (a).
The PP/DOE while responding to issue no.6 raised during the information and reporting check for the previous submission mentioned that the project activity will include a fossil fuel based boiler as stand by for start up and shut downs of CHP. However corresponding parameters required to measure project emissions from fossil fuel consumption are not included in the PDD. The DOE shall provide further information how it validated the compliance of monitoring plan with the applied methodology.