Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each parameter listed as per EB 48 Annex 60 paragraph 10 (a).
Page 16 of the PDD states the value of QOE,BL as 58,032 MWh whereas the other sections states the value of QOE,BL as 63,240MWh. The PP is requested to correct the inconsistencies in the PDD.

2: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The PDD (Page 30) states that the quantity of gross electricity generation by waste heat will be measured by energy meter of accuracy class 1.5%. The DOE is requested to provide further information on how it validated that this is in accordance with para 17 (c ) of EB 61 Annex 21 which states that measuring equipment should be certified to national or IEC standards.



3: The DOE is requested to state if all assumptions/ data/references used in the PDD for emission reduction calculations are in line with the methodology as per VVM v1.2 paragraph 92(a).
i)The DOE is requested to provide further information on how it validated the emission factor calculation for the Sumatera grid. In doing so the DOE is requested to detail the data sources validated and also submit the emission factor calculation worksheet.
ii)The DOE is requested to remove the inconsistencies in Page 20 and 21 of the Validation report related to "methane recovery component".