Submission incomplete:
The DOE is requested to include information on how it has validated the suitability and validaity of input values at the time of investment decision as per VVM v 1.2 paragraph 114 (a).
In particular: (i) total investment; (ii) the electricity tariff; (iii) the suitability of O&M costs and how the "Manual of guidelines for SPH Eletrobras" was considered valid, given that it is dated on 1999; (iv) "other costs" (TUSD. TFSEE, CCEE, operational insurance) included in the spreadsheet of investment analysis (v) the taxes applied to the eletricity sales (PIS+COFINS and IR + CSLL); (vi) the debt/equity ratio applied and (vii) the interest rate applied to the loan.
The DOE is requested to include information on how it has validated the suitability and validaity of input values at the time of investment decision as per VVM v 1.2 paragraph 114 (a).
In particular: (i) total investment; (ii) the electricity tariff; (iii) the suitability of O&M costs and how the "Manual of guidelines for SPH Eletrobras" was considered valid, given that it is dated on 1999; (iv) "other costs" (TUSD. TFSEE, CCEE, operational insurance) included in the spreadsheet of investment analysis (v) the taxes applied to the eletricity sales (PIS+COFINS and IR + CSLL); (vi) the debt/equity ratio applied and (vii) the interest rate applied to the loan.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: