Submission incomplete:
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The PP/DOE are requested to describe how the temperature of the feedwater will be monitored, as required by the methodology AMS I.C.

2: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
The DOE is requested to indicate how the baseline boilers will be used during project implementation. The PDD (pg 20, Figure 15) mentions ”existing boilers” while the validation report (pg A-58) indicates that ”only one bunker boiler will be kept as back up for extreme emergencies...”.

3: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
The DOE is requested to explain how the baseline scenario was selected by the project proponent considering that, as per sheet ” Baseline Efficiency” of the file ” AISA - Biomass_energy_ plant_Panama V3 0.xlsx”, the project did not produce electricity during the period 2005-2007.