Submission incomplete:
The PP/DOE are requested to describe on identification of baseline scenario(s) in PDD as per EB 48 Annex 60 paragraph 10 (a).
The DOE is requested to further assess the baseline scenario for the new 4500TPD facility indicated in PDD in line with the Clarification provided by EB 61,Annex 5 .The DOE should in order to determine the baseline scenario :
a).Identify alternative design options for the 4500TPD clinker facility along with the feasible usage of the waste energy for those designs (with/without waste heat recovery component /with a waste heat recovery component of a different denomination) that was available to the PP.
2.Undertake an investment comparison analysis for the identified alternative designs to the entire greenfield facility for the determination of the baseline scenario.
The PP/DOE are requested to describe on identification of baseline scenario(s) in PDD as per EB 48 Annex 60 paragraph 10 (a).
The DOE is requested to further assess the baseline scenario for the new 4500TPD facility indicated in PDD in line with the Clarification provided by EB 61,Annex 5 .The DOE should in order to determine the baseline scenario :
a).Identify alternative design options for the 4500TPD clinker facility along with the feasible usage of the waste energy for those designs (with/without waste heat recovery component /with a waste heat recovery component of a different denomination) that was available to the PP.
2.Undertake an investment comparison analysis for the identified alternative designs to the entire greenfield facility for the determination of the baseline scenario.