Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each parameter listed as per EB 48 Annex 60 paragraph 10 (a).
In doing so, the DOE/PP are requested to document in the CDM-PDD the results of the measured boiler efficiencies (ε BL,,HG,j,i) used for calculating the CO2 emission factor for the heat generation system (EFBL,HG,j,i) as required by the AM0058 ver. 3 methodology (page 19).

2: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
In doing so, the DOE is requested to provide information justifying the exclusion of the monitoring of CO2 emission factor of the fuels used in the project activity (EFCO2,i,y) from the monitoring plan considering that the “Tool to calculate project or leakage CO2 emissions from fossil fuel combustion” requires this parameter to be monitored.

3: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
In doing so, the DOE is requested to provide information clarifying: i) the inconsistent in the fuel consumption rate (FCi,j,y ) as the validation report shows 64,146 tons while the PDD and the excel-sheet calculation applies a value of 45,763 tons, and ii) clarify the conservativeness of the applied coal price of 511 RMB/ton when compared to the actual value of 460 RMB/ton as it appears that a decrease in fuel expenditure is more conservative.

4: The DOE is requested to include information on how it has validated sensitivity analysis of the investment analysis as per VVM v1.2 paragraph 111 (e).
In doing so, the DOE is requested to: i) provide information justifying the exclusion of the heat generation parameter from the sensitivity analysis, and ii) confirm the calculated critical point (46% increase) for the fuel consumption.