08:54 13 Nov 26
Info Report Check
Submission incomplete:
The DOE is requested to include validation opinion on the accuracy and completeness of the project description in the validation report as per VVM v1.2 paragraph 64(b).
The total installed capacity of the proposed project is 23MW as per page 19 of validation report whereas according to the information in page 5 of PDD, the proposed project activity consists of 2 turbines with an individual capacity of 11.92MW (23.84MW in total) and 2 generators with an individual capacity of 14.375MVA (28.75MVA in total). Please clarify the inconsistency.
The DOE is requested to include validation opinion on the accuracy and completeness of the project description in the validation report as per VVM v1.2 paragraph 64(b).
The total installed capacity of the proposed project is 23MW as per page 19 of validation report whereas according to the information in page 5 of PDD, the proposed project activity consists of 2 turbines with an individual capacity of 11.92MW (23.84MW in total) and 2 generators with an individual capacity of 14.375MVA (28.75MVA in total). Please clarify the inconsistency.

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: