Submission incomplete:
1: The DOE is requested to describe the process taken to validate the accuracy and completeness of the project description as per VVS version 2 paragraphs 64-68 and 69 (a) (b).
The PDD has stated that the main target of project is retrofitting the high and medium pressure cylinder to reduce the coal consumption of the power generation, in particular by promoting the performance of low pressure cylinder, and that the components retrofitted include rotor, blades, diaphragm and its set, inner cylinder and shaft butt seal of high and medium pressure cylinder. However the PDD has not provided the specification of the components prior to the project implementation, and the specification of the components under the project activity. The DOE is requested to further explain how it has validated the accuracy and completeness of the project description.
2: The DOE is requested to describe how it has validated the project boundary and sources of GHG as per VVS version 2 paragraphs 86 and 87.
The DOE is requested to further substantiate how the project boundary has been in line with the methodology paragraph 2 (i.e. The project boundary is the physical, geographical site of the fossil fuel fired power station unit affected by the efficiency measures), as the China Southern Power Grid and Central China PG are included in the project boundary.
3: The DOE is requested to describe how it has assessed the application of the equations and parameters for the calculation of emission reductions as per VVS version 2 paragraphs 97 and 99 (d) (e).
The DOE is requested to further substantiate how it concluded that the algorithms and formulae used to determine emission reductions are in accordance with the applied methodology of AMS-II.B version 9.0. It is not clear how the energy baseline has been calculated in accordance with paragraph 3 of the methodology (i.e. In the case of retrofit measures, the energy baseline is calculated as the monitored performance of the existing generating unit.).
4: The DOE is requested to describe how it has validated the suitability of the input values used in the financial calculations as per VVS version 2 paragraphs 120 and 123 (a).
The DOE is requested to further explain how it has validated the following input values to the investment analysis in line with VVS version 2 paragraph 120 (a) (b) and (c): (a) The amount of annual net electricity supply to the grid and the consumption rate, in particular how it considers the values applied to be conservative based on statistics of CSPG as it is not clear if the values in the statistics are of the similar power plants; (b) the coal price, in particular to apply a fixed price throughout the assessment period considering the validation report page 24 shows an increasing trend of price from year 2000 to 2010; (c) the repair cost, as the cost may have also incurred in the baseline scenario; (d) the saving from the repair cost of the equipment prior to the retrofit; (e) profit loss due to the retrofit, in particular: (i) how 65 days of stoppage has been validated; (ii) why 6850 operational hours are considered to calculate the power loss; (iii) how the DOE has validated the profit of the PO in 2006 and 2007; (f) VAT, in particular why VAT is considered as cost considering that the coal price is already without VAT.
5: The DOE is requested to describe how it has validated the suitability of the benchmark as per VVS version 2 paragraphs 121 and 123 (b).
The Validation Report does not contain DOE's assessment on the suitability of the benchmark.
6: The DOE is requested to provide validation on the compliance of the use of feasibility study report for the investment analysis with the related requirements as per VVS version 2 paragraph 122.
The Validation Report does not contain DOE's opinion of the input values sourced from the approved FSR, in particular whether: (a) the FSR is the basis for the decision to proceed with the investment in the project; (b) the values used in the PDD and associated annexes are fully consistent with the FSR; (c) the input values from the FSR are valid and applicable at the time of investment decision.
7: The DOE is requested to describe how it has validated the compliance of the monitoring plan with the applied methodology(ies) as per VVS version 2 paragraph 132 (a).
The DOE is requested to further explain how the paragraph 6 of the applied methodology has been met (i.e. both fuel use and output need to be metered), as: (i) the project activity will monitor the quantity of electricity supplied by the project activity turbine to the grid in year y, instead of the electricity output from the power plant as per para 2 of the applied methodology; (ii) the PDD page 31 states if the coal consumed by the project activity’s steam turbines could not be measured directly, the monitoring of the heat input is needed.
1: The DOE is requested to describe the process taken to validate the accuracy and completeness of the project description as per VVS version 2 paragraphs 64-68 and 69 (a) (b).
The PDD has stated that the main target of project is retrofitting the high and medium pressure cylinder to reduce the coal consumption of the power generation, in particular by promoting the performance of low pressure cylinder, and that the components retrofitted include rotor, blades, diaphragm and its set, inner cylinder and shaft butt seal of high and medium pressure cylinder. However the PDD has not provided the specification of the components prior to the project implementation, and the specification of the components under the project activity. The DOE is requested to further explain how it has validated the accuracy and completeness of the project description.
2: The DOE is requested to describe how it has validated the project boundary and sources of GHG as per VVS version 2 paragraphs 86 and 87.
The DOE is requested to further substantiate how the project boundary has been in line with the methodology paragraph 2 (i.e. The project boundary is the physical, geographical site of the fossil fuel fired power station unit affected by the efficiency measures), as the China Southern Power Grid and Central China PG are included in the project boundary.
3: The DOE is requested to describe how it has assessed the application of the equations and parameters for the calculation of emission reductions as per VVS version 2 paragraphs 97 and 99 (d) (e).
The DOE is requested to further substantiate how it concluded that the algorithms and formulae used to determine emission reductions are in accordance with the applied methodology of AMS-II.B version 9.0. It is not clear how the energy baseline has been calculated in accordance with paragraph 3 of the methodology (i.e. In the case of retrofit measures, the energy baseline is calculated as the monitored performance of the existing generating unit.).
4: The DOE is requested to describe how it has validated the suitability of the input values used in the financial calculations as per VVS version 2 paragraphs 120 and 123 (a).
The DOE is requested to further explain how it has validated the following input values to the investment analysis in line with VVS version 2 paragraph 120 (a) (b) and (c): (a) The amount of annual net electricity supply to the grid and the consumption rate, in particular how it considers the values applied to be conservative based on statistics of CSPG as it is not clear if the values in the statistics are of the similar power plants; (b) the coal price, in particular to apply a fixed price throughout the assessment period considering the validation report page 24 shows an increasing trend of price from year 2000 to 2010; (c) the repair cost, as the cost may have also incurred in the baseline scenario; (d) the saving from the repair cost of the equipment prior to the retrofit; (e) profit loss due to the retrofit, in particular: (i) how 65 days of stoppage has been validated; (ii) why 6850 operational hours are considered to calculate the power loss; (iii) how the DOE has validated the profit of the PO in 2006 and 2007; (f) VAT, in particular why VAT is considered as cost considering that the coal price is already without VAT.
5: The DOE is requested to describe how it has validated the suitability of the benchmark as per VVS version 2 paragraphs 121 and 123 (b).
The Validation Report does not contain DOE's assessment on the suitability of the benchmark.
6: The DOE is requested to provide validation on the compliance of the use of feasibility study report for the investment analysis with the related requirements as per VVS version 2 paragraph 122.
The Validation Report does not contain DOE's opinion of the input values sourced from the approved FSR, in particular whether: (a) the FSR is the basis for the decision to proceed with the investment in the project; (b) the values used in the PDD and associated annexes are fully consistent with the FSR; (c) the input values from the FSR are valid and applicable at the time of investment decision.
7: The DOE is requested to describe how it has validated the compliance of the monitoring plan with the applied methodology(ies) as per VVS version 2 paragraph 132 (a).
The DOE is requested to further explain how the paragraph 6 of the applied methodology has been met (i.e. both fuel use and output need to be metered), as: (i) the project activity will monitor the quantity of electricity supplied by the project activity turbine to the grid in year y, instead of the electricity output from the power plant as per para 2 of the applied methodology; (ii) the PDD page 31 states if the coal consumed by the project activity’s steam turbines could not be measured directly, the monitoring of the heat input is needed.