Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each parameter listed as per EB 48 Annex 60 paragraph 10 (a).
EGmax, hist (Maximum annual amount of electricity supplied by the power plant to the grid prior to the start of the project activity during the last 3 years before the project implementation) and EGmin, hist (Minimum annual amount of electricity supplied by the power plant to the grid prior to the start of the project activity during the last 3 years before the project implementation) were determined based on the electricity generation data from July to June in the respective years, not from January to December. Since these parameters are used in the calculation of emission reductions together with grid emission factor, which is estimated based on the electricity generation data from January to December in each year, these parameters should be determined based on the electricity generation data from January to December in each year, It is requested to correct these parameters based on the electricity generation data from January to December in each year.

2: The PP/DOE are requested to describe in detail the calculation of ex-ante emission reductions ( with actual data and equations) as per EB 48 Annex 60 paragraph 10 (a).
In leakage calculation, the operating margin emission factor was calculated using 3 year data. Since the methodology requires the ex-post monitoring of the grid emission factor, the operating margin emission factor should be calculated using 1 year data. It is requested to correct the operating margin emission factor using 1 year data.