Submission incomplete:
1: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
In particular, the PDD should clearly present what is measured by the main meter: a) if the total electricity output from all project components are monitored together with one main meter at the substation; or b) if they are monitored individually; or c) main meter is shared with any other wind power projects. In addition, the means of crosschecking should be clarified.

2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
In particular, the DOE should explain how it has validated: a) the source of the applied PLF values, in particular, implication the approval for "the further development of the wind farm" by Rajasthan Renewable Energy Corporation Ltd. has; b) the tax shield; and c) application of the income tax rate and/or minimum alternate tax in the IRR calculation spreadsheet.

3: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
In particular, the DOE should explicitly indicate the date when the commercial lending rates were obtained.