Submission incomplete:
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The project descriptions are not consistent given that the installed capacity of the project activity is described as 88.3 MW (page 2 of the PDD) whereas the capacity of the installed turbines are 2*45.3MW. In doing so, please also specify the number and capacity of the turbines and generators of the project activity in A.4.3 section.
2: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
The DOE shall explain how it has validated the correctness and conservativeness of the determination of grid emission factor applied in the project activity (0.6447 t CO2/MWh).
3: The DOE is requested to provide information on how it has validated the evidence provided for prior consideration of CDM as per VVM v 1.2 paragraph 104(b).
The DOE did not explain whether the CDM prior consideration form has been sent to the DNA of host country as per Guidelines on the demonstration and assessment of prior consideration of the CDM, Version 04.0, paragraph 2.
4: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE has not explain how it have validated the finance structure of the project activity, in particular, whether the project activity has applied the bank loan. If so, the DOE shall explain how it has validated the correctness of the financial calculation, in particular, whether the interest of the loan should be considered in the calculation of income tax. In addition, the DOE shall also explain the appropriateness of the inclusion of Workers Participation as one component of the cash outflow in calculating the project IRR.
5: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE shall explain how it has validated the suitability of the input values to the financial calculation as per paragraph 111 (a) & (b) of VVM version 1.2, in particular, the investment cost, the tariffs, the running costs and the plant load factor.
6: The DOE is requested to provide information on how the distinctive differences between the project activity and the similar projects identified in the selected scope are justified as per VVM v 1.2 paragraph 121 (c).
The DOE shall explain how it has assessed that the plants, identified in the step 2 of paragraph 47 of the Additionality Tool version 6, applied the technologies different from the technology applied in the proposed project activity, in particular, the identified hydroelectric plants. In doing so, please specify how the essential distinctions between the project activity and each identified plant has been assessed.
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The project descriptions are not consistent given that the installed capacity of the project activity is described as 88.3 MW (page 2 of the PDD) whereas the capacity of the installed turbines are 2*45.3MW. In doing so, please also specify the number and capacity of the turbines and generators of the project activity in A.4.3 section.
2: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
The DOE shall explain how it has validated the correctness and conservativeness of the determination of grid emission factor applied in the project activity (0.6447 t CO2/MWh).
3: The DOE is requested to provide information on how it has validated the evidence provided for prior consideration of CDM as per VVM v 1.2 paragraph 104(b).
The DOE did not explain whether the CDM prior consideration form has been sent to the DNA of host country as per Guidelines on the demonstration and assessment of prior consideration of the CDM, Version 04.0, paragraph 2.
4: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE has not explain how it have validated the finance structure of the project activity, in particular, whether the project activity has applied the bank loan. If so, the DOE shall explain how it has validated the correctness of the financial calculation, in particular, whether the interest of the loan should be considered in the calculation of income tax. In addition, the DOE shall also explain the appropriateness of the inclusion of Workers Participation as one component of the cash outflow in calculating the project IRR.
5: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE shall explain how it has validated the suitability of the input values to the financial calculation as per paragraph 111 (a) & (b) of VVM version 1.2, in particular, the investment cost, the tariffs, the running costs and the plant load factor.
6: The DOE is requested to provide information on how the distinctive differences between the project activity and the similar projects identified in the selected scope are justified as per VVM v 1.2 paragraph 121 (c).
The DOE shall explain how it has assessed that the plants, identified in the step 2 of paragraph 47 of the Additionality Tool version 6, applied the technologies different from the technology applied in the proposed project activity, in particular, the identified hydroelectric plants. In doing so, please specify how the essential distinctions between the project activity and each identified plant has been assessed.