20:13 19 Jul 25
Info Report Check
Submission incomplete:
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
The PDD states the used value of the grid emission factor is sourced from official publication by the Malaysian DNA; however, the PDD does not contain information on the methodological approaches used to calculate the grid emission factor in line with the "Tool to calculate the emission factor for an electricity system".
2: The DOE is requested to describe the steps taken to assess the equations applied to calculate the baseline/ project emissions, leakage and emission reductions as per the chosen methodology as per VVM v1.2 paragraph 92.
The validation report states that the value of the grid emission factor is based on study prepared by the Malaysian DNA for the year 2008; however the validation report does not contain information on how the DOE validated the compliance of the emission factor calculation with the requirement of the "Tool to calculate emission factor for an electricity system", including the applicability of the data vintage used for the calculation.
3: The DOE is requested to state that the estimates in the PDD are reasonable for data and parameters that are monitored during implementation and are available after validation as per VVM v1.2 paragraph 91.
The validation report does not contain information on how the DOE validated that ex-ante estimate for "Quantity of net electricity displaced as a result of the implementation of the CDM project activity in year y" is reasonable for the project, also taking into account that the project proponent intends to expand the production capacity of the biomass processing plant so that all the forecasted green electricity that may be generated from the biogas shall be utilised.
4: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The validation report does not contain information on how the DOE validated the value of "grid electricity displaced (MWh)" input to the investment analysis, and how it has been taken into consideration the fact that the project proponent intends to expand the production capacity of the biomass processing plant so that all the forecasted electricity that may be generated from the biogas shall be utilised.
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
The PDD states the used value of the grid emission factor is sourced from official publication by the Malaysian DNA; however, the PDD does not contain information on the methodological approaches used to calculate the grid emission factor in line with the "Tool to calculate the emission factor for an electricity system".
2: The DOE is requested to describe the steps taken to assess the equations applied to calculate the baseline/ project emissions, leakage and emission reductions as per the chosen methodology as per VVM v1.2 paragraph 92.
The validation report states that the value of the grid emission factor is based on study prepared by the Malaysian DNA for the year 2008; however the validation report does not contain information on how the DOE validated the compliance of the emission factor calculation with the requirement of the "Tool to calculate emission factor for an electricity system", including the applicability of the data vintage used for the calculation.
3: The DOE is requested to state that the estimates in the PDD are reasonable for data and parameters that are monitored during implementation and are available after validation as per VVM v1.2 paragraph 91.
The validation report does not contain information on how the DOE validated that ex-ante estimate for "Quantity of net electricity displaced as a result of the implementation of the CDM project activity in year y" is reasonable for the project, also taking into account that the project proponent intends to expand the production capacity of the biomass processing plant so that all the forecasted green electricity that may be generated from the biogas shall be utilised.
4: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The validation report does not contain information on how the DOE validated the value of "grid electricity displaced (MWh)" input to the investment analysis, and how it has been taken into consideration the fact that the project proponent intends to expand the production capacity of the biomass processing plant so that all the forecasted electricity that may be generated from the biogas shall be utilised.