Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
In particular, the PP/DOE shall explain how the monitoring parameter, EGBL,y is calculated from the measured parameters, clearly presenting the algorithm used to determine the net electricity export by the project activity from the main meter reading at the substation(s) and the WT controller.
2: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
In doing so, please explicitly indicate the date when the cost of debt and the market return were obtained.
1: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
In particular, the PP/DOE shall explain how the monitoring parameter, EGBL,y is calculated from the measured parameters, clearly presenting the algorithm used to determine the net electricity export by the project activity from the main meter reading at the substation(s) and the WT controller.
2: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
In doing so, please explicitly indicate the date when the cost of debt and the market return were obtained.