Info Report Check
Submission incomplete:
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The project employs an open flare. Monitoring plan does not list monitoring of flame detector to monitor continuous operation of open flare as required by ‘Tool to determine project emissions from flaring gases containing methane'.

2: The DOE is requested to describe how it has validated that the selected monitoring methodology(ies) are correctly applied and they are not subject to clarifications, revisions or deviations as per VVM v1.2, paragraphs 72-74.
PDD on page 59 states that the net heat supplied by biogas is based on measurement of amount of steam generated with biogas multiplied by enthalpy of the dead steam after back pressure turbine. Amount of steam generated with biogas will be determined by indirect method based on monitoring the gross steam generated after back pressure-turbine, the quantity of the fired coal and the biogas and their respective net calorific values. Enthalpy of steam after back pressure turbine will be determined based on steam table. The DOE is requested to describe how it has validated that the selected monitoring approach to calculate the net heat supplied by biogas is in compliance with the applied methodology, and is not subject to clarification, revision or deviation.

3: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraphs 110 and 114 (c).
The excel file 'Dong Xanh Project Financial (Risk) Assessment_CDM project activity' in the sheet named 'Project sensitivity' presents the sensitivity analysis. However, the outcome of the sensitivity analysis especially for input parameters, 'electricity export' and 'Costs for electricity from the grid' cannot be reproduced.

4: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The validation report does not contain information on how the DOE has cross-checked the suitability of the applied electricity tariff for import of electricity from gird against third-party or publicly available sources.