07:35 23 Apr 25
Info Report Check
Submission incomplete:
1: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The VR lacks information on how the DOE has validated: (a) that comparison with projects under validation is appropriate; (b) the likelihood of the remaining portion of the investment cost;(c) the loan interest and the repayment period in line with the VVM version 0.1 para 111.
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The PDD section B.7.1 mentions that electricity meter for parameter Egfacility,y is installed in the substation, However, the VR page 25 mentions that the metering equipment is installed at the project site.
3: The DOE is requested to explain how the comments received during the stakeholder consultation were considered as per VVM v1.2, paragraph 40, 174 (c).
VR lacks information on why issues raised in the comment are not related specifically to the project in question
1: The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The VR lacks information on how the DOE has validated: (a) that comparison with projects under validation is appropriate; (b) the likelihood of the remaining portion of the investment cost;(c) the loan interest and the repayment period in line with the VVM version 0.1 para 111.
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The PDD section B.7.1 mentions that electricity meter for parameter Egfacility,y is installed in the substation, However, the VR page 25 mentions that the metering equipment is installed at the project site.
3: The DOE is requested to explain how the comments received during the stakeholder consultation were considered as per VVM v1.2, paragraph 40, 174 (c).
VR lacks information on why issues raised in the comment are not related specifically to the project in question
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: