Info Report Check
Submission incomplete:
1: The PP/DOE are requested to list all relevant assumptions, data, input values and references used in the investment analysis and the results of the investment analysis as per EB 48 Annex 60 paragraph 10 (a).
The PDD describes the method for deriving the benchmark. However, the calculation of the benchmark is not described in the PDD or the spreadsheet submitted does not contain the calculation of the benchmark. The DOE is required to submit the spreadsheet which contains the calculation of the benchmark.

2: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
The DOE is requested to further clarify whether the expected return on an Energy Sector Asset is for electricity generation in general or specific to the wind power generation. In case it is for electricity generation in general, the DOE is required to clarify how it can reflect the characteristics of the wind power generation.

3: The DOE is requested to explain how the comments received during the stakeholder consultation were considered as per VVM v1.2, paragraph 40, 174 (c).
The DOE is requested to provide the comments received in Table A-5, Annex 5 of the validation report. Also, the DOE is required to further clarify how it considered the comments received considering there are two comments received and one comment (by jindal) is considered project specific, which is not in line with the explanation of the validation report.