19:57 16 Jul 25
Info Report Check
Submission incomplete:
1: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
The DOE has not demonstrated that the internal benchmark selected has been used for similar projects with similar risks, developed by the same company as per EB62 Annex 5 paragraph 14. Furthermore, the benchmark spreadsheet has not been submitted.
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The DOE has not explained why parameter NCVi,y required by Tool to calculate project or leakage CO2 emissions from fossil fuel combustion is not included in the monitoring plan.
1: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
The DOE has not demonstrated that the internal benchmark selected has been used for similar projects with similar risks, developed by the same company as per EB62 Annex 5 paragraph 14. Furthermore, the benchmark spreadsheet has not been submitted.
2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The DOE has not explained why parameter NCVi,y required by Tool to calculate project or leakage CO2 emissions from fossil fuel combustion is not included in the monitoring plan.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: