Submission incomplete:
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
Some information on leakage at page 45 of the PDD is not readable; text is missing.
2: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
Some information about the parameter "Biomass residues categories and quantities used in the project activity" at page 51 of the PDD is not readable; text is missing. The same situation is at page 52 of the PDD.
3: The DOE is requested to provide information on how it has validated the evidence provided for prior consideration of CDM as per VVM v 1.2 paragraph 104(b).
At page 47 of the Validation Report (VR) it is stated that "On 2007-05-08, the project owner applied for bank loan to Bank of China, Changge Branch. This was refused on 2007-06-11 due to the poor financial condition of the project"; however the VR does not say what evidence was provided in this regard and how it was assessed. It is also noted that the PDD does not contain any information about application for and refusal of the bank loan.
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
Some information on leakage at page 45 of the PDD is not readable; text is missing.
2: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
Some information about the parameter "Biomass residues categories and quantities used in the project activity" at page 51 of the PDD is not readable; text is missing. The same situation is at page 52 of the PDD.
3: The DOE is requested to provide information on how it has validated the evidence provided for prior consideration of CDM as per VVM v 1.2 paragraph 104(b).
At page 47 of the Validation Report (VR) it is stated that "On 2007-05-08, the project owner applied for bank loan to Bank of China, Changge Branch. This was refused on 2007-06-11 due to the poor financial condition of the project"; however the VR does not say what evidence was provided in this regard and how it was assessed. It is also noted that the PDD does not contain any information about application for and refusal of the bank loan.