Info Report Check
Submission incomplete:
1: The PP/DOE are requested to complete all sections of the PDD related to the description of the project activity as per PS version 1 paragraphs 30-34.
Note the missing references ("Error! Reference source not found") on PDD p.2 and p.15.
2: The PP/DOE are requested to list and justify in the PDD the data and parameters used to calculate the emission reductions as per PS version 1 paragraphs 52 and 53.
Table 9 (PDD p.11-14) is incomplete as it is truncated.
3: The DOE is requested to describe how it has validated the suitability of the input values used in the financial calculations as per VVS version 2 paragraphs 120 and 123 (a).
The DOE is requested to crosscheck the input values for both Group 2 and 3. In particular: The electricity tariff, source is not dated and no crosscheck.
The initial investment, no crosscheck.
The operation and maintenance costs, the source is not dated and no crosscheck.
Use of transmission system tariff, no crosscheck.
Reference /21/, /22/, /23/ and /24/ refer to previous versions of the PDD.
4: The DOE is requested to describe how it has assessed the adequacy of the local stakeholder consultation as per VVS v2 paragraphs 139 and 140.
The DOE is requested to provide detailed information on how it has validated that the PP completed the local stakeholder consultation process for the the Virginopolis site before submitting the proposed CDM project activity for validation (PS v.2.1 paragraph 69).
1: The PP/DOE are requested to complete all sections of the PDD related to the description of the project activity as per PS version 1 paragraphs 30-34.
Note the missing references ("Error! Reference source not found") on PDD p.2 and p.15.
2: The PP/DOE are requested to list and justify in the PDD the data and parameters used to calculate the emission reductions as per PS version 1 paragraphs 52 and 53.
Table 9 (PDD p.11-14) is incomplete as it is truncated.
3: The DOE is requested to describe how it has validated the suitability of the input values used in the financial calculations as per VVS version 2 paragraphs 120 and 123 (a).
The DOE is requested to crosscheck the input values for both Group 2 and 3. In particular: The electricity tariff, source is not dated and no crosscheck.
The initial investment, no crosscheck.
The operation and maintenance costs, the source is not dated and no crosscheck.
Use of transmission system tariff, no crosscheck.
Reference /21/, /22/, /23/ and /24/ refer to previous versions of the PDD.
4: The DOE is requested to describe how it has assessed the adequacy of the local stakeholder consultation as per VVS v2 paragraphs 139 and 140.
The DOE is requested to provide detailed information on how it has validated that the PP completed the local stakeholder consultation process for the the Virginopolis site before submitting the proposed CDM project activity for validation (PS v.2.1 paragraph 69).