Info Report Check
Submission incomplete:
1: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The VR lacks information on how the DOE validated: (a) that comparison with projects under validation is appropriate; (b) the likelihood of the remaining portion of the investment cost; (c) the loan interest and the repayment period in line with the VVM version 0.1 para 111.

2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The PDD section B.7.1 mentions that electricity meter for parameter Egfacility,y is installed in the substation, and the meter for parameter Egexport,y/Egimport/y is installed at project boundary. However, the VR page 25 mentions that the metering equipment is installed at the project site.

3: The DOE is requested to explain how the comments received during the stakeholder consultation were considered as per VVM v1.2, paragraph 40, 174 (c).
The VR lacks information on how the DOE has considered the comments received.