06:37 22 Dec 24
Info Report Check
Submission incomplete:
1: The DOE is requested to include validation opinion on the accuracy and completeness of the project description in the validation report as per VVM v1.2 paragraph 64(b).
The DOE shall clarify whether the project is implemented in an existing or new industry facility given that the PDD in page 10 indicates that project activity is implemented at a newly constructed cement production facilty whereas VR in page 12 indicates that the project activity is implemented at an existing facilty.
2: The DOE is requested to state if the methodology provides different options for equations and parameters and if the selection is appropriate as per VVM v1.2 paragraph 90.
The DOE shall explain the appropriateness of method selection to determine the capping of baseline emissions. In doing so, the DOE shall explain: (i). what the source of the waste energy is; (ii). what the WECM is; and (iii). how the waste energy is converted into the final output.
1: The DOE is requested to include validation opinion on the accuracy and completeness of the project description in the validation report as per VVM v1.2 paragraph 64(b).
The DOE shall clarify whether the project is implemented in an existing or new industry facility given that the PDD in page 10 indicates that project activity is implemented at a newly constructed cement production facilty whereas VR in page 12 indicates that the project activity is implemented at an existing facilty.
2: The DOE is requested to state if the methodology provides different options for equations and parameters and if the selection is appropriate as per VVM v1.2 paragraph 90.
The DOE shall explain the appropriateness of method selection to determine the capping of baseline emissions. In doing so, the DOE shall explain: (i). what the source of the waste energy is; (ii). what the WECM is; and (iii). how the waste energy is converted into the final output.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: