Submission incomplete:
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The "area of the reservoir, measured in the surface of the water, after the implementation of the project activity, when the reservoir is full" is not included as a monitoring parameter in the submitted PDD, as per the requirements in page 12 of AMS.I.D version 16 (which requires to monitor parameters relevant to reservoir based hydro following the most recent version of ACM0002).
2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE should include information on the validation of the income tax calculation, in particular if it complies with the requirements of EB62, Annex 5 paragraph 11.
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
The "area of the reservoir, measured in the surface of the water, after the implementation of the project activity, when the reservoir is full" is not included as a monitoring parameter in the submitted PDD, as per the requirements in page 12 of AMS.I.D version 16 (which requires to monitor parameters relevant to reservoir based hydro following the most recent version of ACM0002).
2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE should include information on the validation of the income tax calculation, in particular if it complies with the requirements of EB62, Annex 5 paragraph 11.