Submission incomplete:
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
Equations 1 and 2 in page 18 of the PDD and formula 4 in page 19 of the PDD are not correctly written. Also, the validation report (page 37) has formulas that are not complete.

2: The PP/DOE are requested to describe in detail the monitoring plan as per EB 48 Annex 60 paragraph 10 (a).
The PDD (page 37) states that the PP shall select one of the statistical approaches and detail the selection process in the monitoring report. However, as per the EB50 Annex 30 para 2, the "CDM Project Design Documents (PDDs) utilising sampling for the determination of parameter values for calculating emission reductions shall include a sampling plan with a description of the sampling approach". Thus, the PP is required to include the sampling approach to be used in the monitoring plan.