Info Report Check
Submission incomplete:
1: The PP/DOE are requested to present common practice analysis as per EB 48 Annex 60 paragraph 10 (a).
The PP is requested to provide full details on how it has conducted common practice analysis as per EB 63 Annex 12 para 6-7 (steps 2&3) : i) identify all the plants delivering the same output (N all) and applying technologies different (N diff) from the proposed project activity in the region, and ii) indicate number of N all and N diff.

2: The DOE is requested to report how it has validated the scope of the common practice analysis as per VVM v 1.2 paragraph 121 (a).
The DOE has referred to reference documents numbered 75,73 and 62 to validate that different provinces in China have different GDP, different salary and different tariff (Page 41 of the validation report). However, the reference documents numbered 75,73 and 62 are related to purchase contract for the speed control system, contract on the safety check of water storage and notification on the adjustment of self raised capital ratio respectively. The DOE is requested to rectify the inconsistencies.

3: The DOE is requested to provide information on how it has assessed the existence of the similar projects for common practice analysis as per VVM v 1.2 paragraph 121 (b).
The DOE is requested to provide full details on how it has validated common practice analysis as per EB 63 Annex 12 para 6-7 (steps 2&3) : i) identify all the plants delivering the same output (N all) and applying technologies different (N diff) from the proposed project activity in the region, and ii) indicate number of N all and N diff.