Info Report Check
Submission incomplete:
1: The PP/DOE are requested to describe in detail the monitoring plan as per EB 48 Annex 60 paragraph 10 (a).
The PP/DOE are requested to describe in detail the monitoring plan, including clear descriptions of which measurement equipment is used, and where and how the parameters are to be measured, as per EB 48 Annex 60 paragraph 10 (a) and EB 34 Annex 09.
The DOE shall provide information on whether the monitoring arrangements described in the monitoring plan are feasible for the 6 bundled projects within the project design, as per VVM v 01.2, paragraph 123 b (i).

2: The DOE is requested to provide the information about the greenhouse gas emissions within the project boundary caused by the implementation of the project activity which contribute to more than 1% of the expected annual emission reductions ER/year and which are not addressed in by the applied methodology as per VVM v1.2 paragraph 77.
The Validation Report does not contain information about the greenhouse gas emissions within the project boundary caused by the implementation of the project activity which contribute to more than 1% of the expected annual emission reductions ER/year and which are not addressed in by the applied methodology as per VVM v1.2 paragraph 77.