Info Report Check
Submission incomplete:
The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
1)The DOE shall clarify the gap between the loan interest used in the investment analysis, 10.5% (sourced from loan sanction letter from Bank of Baroda dated: 21/08/2010) and the benchmark 13.25%(sourced from the letter from Bank of Baroda dated 31/12/2010)
2)The PP/DOE is request to provide more information on the loan interest, eg, loan period.