Info Report Check
Submission incomplete:
1: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to explain how it has validated the suitability of the input parameters used in the investment analysis in line with the requirement of VVM v1.2 paragraph 114(a). In doing so, the DOE should explain the method of validation of the input parameters such as project lifetime, value added tax, income tax, surcharges on city building and maintenance, surcharge on education, depreciation rate, residual rate, number of staffs, insurance charge and public reserve fund and public welfare fund.

2: The DOE is requested to address the changes made to the project deign since the global stakeholder consultation was conducted as per VVM v1.2 paragraph 173(c).
The DOE is requested to address the changes made to the project deign since the global stakeholder consultation was conducted as per VVM v1.2 paragraph 173(c). In doing so the DOE should also submit the correct version of the validation report given that the validation report submitted by the DOE has the first section (first 30 pages) repeated thrice in the validation report.