Info Report Check
Submission incomplete:
1: The DOE is requested to provide information on the steps taken to validate the project starting date as per VVM v 1.2 paragraph 104 (a).
In doing so, the DOE is requested to report whether the starting dates for the other four components of the project activity are later than 27 September 2004.

2: The DOE is requested to provide information on the steps taken to validate the actions taken to secure the CDM status between the project starting date and the start of validation as per EB 62 Annex 13 paragraph 7.
In particular, the DOE is requested to report the output delivered by each of the three CDM consultants in terms of CDM.

3: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
In particular, the DOE is requested to report the findings of the comparisons, such as the figures, for: a) the investment cost to the actual cost in the purchase order; b) the PLF to the actual generation records; and c) the O&M costs. In addition, the DOE is requested to report further on the appropriateness of: a) the tax rate of 33.6% for the whole project lifetime, b) assuming the tariff of the first year (3.5 INR/kWh) from the 14th year.

4: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
In particular, to report how it has validated: a) the application of the inflation rate based on the data between 2004 and 2008 considering that the project starting date is in 2005; b) the parameter used to calculate the WACC: i) 19.8% cost of equity; and ii) 33.36% tax rate.