Info Report Check
Submission incomplete:
1: The PP/DOE are requested to describe in detail the calculation of ex-ante emission reductions ( with actual data and equations) as per EB 48 Annex 60 paragraph 10 (a).
It should contain step-wise calculation of the emission reductions, demonstrating how the values are applied to the equations.

2: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
In doing so, the PP should clearly indicate how the monitored parameter (EGy) is determined in section B.7.1.by identifying: a) the parameters that are directly measured; b) the meter used for each measured parameter; and c) how the monitored parameter is determined from the measured parameters.

3: The DOE is requested to indicate in the validation report if the latest PDD template is used as per VVM v1.2, paragraph 55.
The footer of the PDD is modified; the template must not be codified. Please refer to Guideline of completing PDD. Also, the font is altered in some parts of the PDD.

4: The DOE is requested to state if all assumptions/ data/references used in the PDD for emission reduction calculations are in line with the methodology as per VVM v1.2 paragraph 92(a).
In particular, the DOE shall report how it has validated the grid emission factor (EFgrid), including the details of the data used, such as the source and date.

5: The DOE is requested to state that the estimates in the PDD are reasonable for data and parameters that are monitored during implementation and are available after validation as per VVM v1.2 paragraph 91.
In particular, the DOE shall clearly report how the net electricity supplied to the grid by the project activity will be determined by clearly stating the functions of each meter, M11, M12 and M2. In doing so, also clarify which measurement the power sales/ purchase invoice will be based on.

6: The DOE is requested to provide information on the steps taken to validate the project starting date as per VVM v 1.2 paragraph 104 (a).
In particular, the DOE shall report: a) how it has confirmed the purchase of the construction material to be the earliest commitment; and b) if any other contract related to the implementation of the project such as EPC contract or construction contract was signed prior to this date.

7: The DOE is requested to provide information on the steps taken to validate the actions taken to secure the CDM status between the project starting date and the start of validation as per EB 49 Annex 22 paragraph 8 b.
In particular, the DOE shall report if the continuing and real actions to secure the CDM status i.e. activities related to the implementation of the project activity as a CDM project, is demonstrated with evidence such as contractual agreements.

8: The DOE is requested to resolve all CARs and CLs raised as per VVM v 1.2 paragraph 37.
In particular, it is not clear:
a) how CL7 regarding the plant load factor is closed, in particular, if the PLF was based on the FSR or the revised FSR, considering that the capacity was revised after the detailed survey (see CAR 2 and 3); and
b) how CL11 regarding the "underdeveloped area" was closed as it is not clear how the DOE has interpreted the decree (DECREE No. 108/2006/ND-CP).