Info Report Check
Submission incomplete:
1. There is an inconsistency of CER between the project view page (162,939 CO2) and the rest of the documents submitted (178,729 CO2).
2. The submitted validation report is in track changes.
3. There is an inconsistency of the version of methodology between the view page (ACM0006 version 13) and the rest of the documents submitted (ACM0006 version 14).
4. There is an inconsistency in the cross-referencing of the VVS version. The submission view page refers to VVS 1, which is no longer valid, whereas the validation report refers to VVS 2.
1. There is an inconsistency of CER between the project view page (162,939 CO2) and the rest of the documents submitted (178,729 CO2).
2. The submitted validation report is in track changes.
3. There is an inconsistency of the version of methodology between the view page (ACM0006 version 13) and the rest of the documents submitted (ACM0006 version 14).
4. There is an inconsistency in the cross-referencing of the VVS version. The submission view page refers to VVS 1, which is no longer valid, whereas the validation report refers to VVS 2.