Info Report Check
Submission incomplete:
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
VSCpc (Mean stack gas volume flow rate for the project campaign) and GSBL (Gauze supplier for baseline campaign) required by methodology are not listed in the PDD as monitoring parameters. Please note that each and every parameter as required by the methodology must be clearly listed in the monitoring plan. Information is requested.
2: The DOE is requested to provide information on the steps taken to validate the project starting date as per VVM v 1.2 paragraph 104 (a).
The DOE has validated through site interviews, that the project starting date will be January 2013, which is expected to be the date of monitoring equipment purchase and represents the earliest of the dates at which the implementation or construction of the project activity will take place. However, as per page 18 of the Validation Report, the DOE confirms that the cost (Catalyst installation and operation) is calculated based on the catalyst contract agreement between the Projects Participants (confidential information). It appears that the catalyst contract agreement is available at the time of validation which is prior to January 2013. It is not clear whether the date of catalyst contract agreement should be considered as the project start date, as per EB 66 Annex 63. Information is requested.
1: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
VSCpc (Mean stack gas volume flow rate for the project campaign) and GSBL (Gauze supplier for baseline campaign) required by methodology are not listed in the PDD as monitoring parameters. Please note that each and every parameter as required by the methodology must be clearly listed in the monitoring plan. Information is requested.
2: The DOE is requested to provide information on the steps taken to validate the project starting date as per VVM v 1.2 paragraph 104 (a).
The DOE has validated through site interviews, that the project starting date will be January 2013, which is expected to be the date of monitoring equipment purchase and represents the earliest of the dates at which the implementation or construction of the project activity will take place. However, as per page 18 of the Validation Report, the DOE confirms that the cost (Catalyst installation and operation) is calculated based on the catalyst contract agreement between the Projects Participants (confidential information). It appears that the catalyst contract agreement is available at the time of validation which is prior to January 2013. It is not clear whether the date of catalyst contract agreement should be considered as the project start date, as per EB 66 Annex 63. Information is requested.