Submission incomplete:
The DOE is requested to describe how it has validated the compliance of the monitoring plan with the applied methodology(ies) as per VVS version 09 paragraph 149 (a).
The PDD (pg.7) has provided an indicative metering diagram which shows that common metering (i.e. project and non-project WTGs) will be done at the substation. The monitoring plan has listed three parameters (EGexport,y, EGimport,y, and EGLosses,y). The apportioning procedure (PDD pg. 26) indicates the following parameters for calculating the EGPJ,facility,y : (i) Electricity generated by installed WTG of PP connected to the applicable metering point (EGcontroller,WTG); (ii) Total generation by all the connected WTGs to the applicable metering point (EGcontroller, metering point), (iii) Total import, kWh by all the WTGs at the metering point (EGTotal import,metering point) and (iv) Total export, kWh by all the WTGs at the metering point (EGTotal export,metering point). However, no information is provided for the monitoring of parameters EGcontroller,WTG, EGcontroller, metering point, EGTotal import,metering point and EGTotal export,metering point. The PP/DOE are requested to provide a monitoring plan which shows a clear description of all the monitored parameters and how they will be monitored. In doing so, please include a metering diagram which shows all the metering points.