Info Report Check
Submission incomplete:
1: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
(i). It is not clear how the applicability condition 6(f) has been validated, please provide more detailed information on pre-project scenario; (ii). Please further explain how the applicability has been validated as per 6(g)(iii) of AMS III.Q version 3, please also provide the information on the energy demand of the cement production process (e.g., based on specific energy consumption specified by the manufacturer).
2: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
It is not clear how the suitability and conservativeness of the parameter QOE,BL(output energy that can be theoretically produced) has been validated. Considering that the power generation of the project during the first half year of 2009 is 17643.8 MWh which is much higher than the assumed power generation (14580 MWh) of a half year.
1: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
(i). It is not clear how the applicability condition 6(f) has been validated, please provide more detailed information on pre-project scenario; (ii). Please further explain how the applicability has been validated as per 6(g)(iii) of AMS III.Q version 3, please also provide the information on the energy demand of the cement production process (e.g., based on specific energy consumption specified by the manufacturer).
2: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
It is not clear how the suitability and conservativeness of the parameter QOE,BL(output energy that can be theoretically produced) has been validated. Considering that the power generation of the project during the first half year of 2009 is 17643.8 MWh which is much higher than the assumed power generation (14580 MWh) of a half year.