The DOE is requested to include description of the process taken to validate the accuracy and completeness of the project description in VR as per VVM v1.2 paragraph 64(a).
In particular, the DOE is requested to explain how the total installed capacity of each project in the bundle was validated as 2x3.4MW = 6.8MW, while the PDD indicates (page 4) that the rated capacity of each turbine in the bundle is 3.579MW instead of 3.4 MW.
The DOE is requested to include description of the process taken to validate the accuracy and completeness of the project description in VR as per VVM v1.2 paragraph 64(a).
In particular, the DOE is requested to explain how the total installed capacity of each project in the bundle was validated as 2x3.4MW = 6.8MW, while the PDD indicates (page 4) that the rated capacity of each turbine in the bundle is 3.579MW instead of 3.4 MW.