02:51 05 Jan 26
Info Report Check
Submission incomplete:
The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE is requested to further validate the suitability of the self-consumption rate (22.62%) used in the investment analysis, in doing so, please provide the list of minimum capacity of self consumption motors(4.82MW) mentioned in validation report page 84.
The DOE is requested to confirm the accuracy of the financial calculations carried out for the investment analysis as per VVM v 1.2 paragraph 114 (c).
The DOE is requested to further validate the suitability of the self-consumption rate (22.62%) used in the investment analysis, in doing so, please provide the list of minimum capacity of self consumption motors(4.82MW) mentioned in validation report page 84.

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: