Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
In particular, the PP is requested to include the QA/QC procedures required by the methodology for each monitored data.

2: The DOE is requested to provide information on how the distinctive differences between the project activity and the similar projects identified in the selected scope are justified as per VVM v 1.2 paragraph 121 (c).
In particular, how it verified the applied tariff for Yayangshan Hydropower Project.

3: The DOE is requested to include a clear validation opinion on the adequacy of the local stakeholder consultation as per VVM v1.2 paragraph 129.
In doing this, the DOE is requested to explain how it validated (i) that the summary of comments in the PDD is complete and (ii) that the PP took due account of the comments received in the PDD.