Info Report Check
Submission incomplete:
1: The DOE is requested to state if the PDD provides a clear description of the baseline scenario(s) which includes description of the technology and the activities that would take place in the absence of the project activity as per VVM v1.2 paragraph 86.
The DOE is requested to provide information on how it has verified during its site visit the following baselines for biomass and heat:
(a) the biomass that is directly sourced from local rice industries and used by the project activity would be dumped or left to decay or burned in an uncontrolled manner without utilizing it for energy purposes (p. 18 of the VR); and
(b) the thermal energy would be supplied by coal fired boilers, in particular for those consumers that are going to receive the thermal energy from the project activity.
2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to include information on how it has validated the auxiliary consumption rate, the quantity of water consumed, the total number of staff members (i.e. 55 persons), the Repair Fee and the Other Fee applied in the investment analysis spreadsheet, in accordance with VVM v 1.2 paragraph 111.
1: The DOE is requested to state if the PDD provides a clear description of the baseline scenario(s) which includes description of the technology and the activities that would take place in the absence of the project activity as per VVM v1.2 paragraph 86.
The DOE is requested to provide information on how it has verified during its site visit the following baselines for biomass and heat:
(a) the biomass that is directly sourced from local rice industries and used by the project activity would be dumped or left to decay or burned in an uncontrolled manner without utilizing it for energy purposes (p. 18 of the VR); and
(b) the thermal energy would be supplied by coal fired boilers, in particular for those consumers that are going to receive the thermal energy from the project activity.
2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to include information on how it has validated the auxiliary consumption rate, the quantity of water consumed, the total number of staff members (i.e. 55 persons), the Repair Fee and the Other Fee applied in the investment analysis spreadsheet, in accordance with VVM v 1.2 paragraph 111.