17:28 04 Jul 25
Info Report Check
Submission incomplete:
1: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
In particular, please clarify the reference given for the grid emission factor (/37/) in page 30 of the validation report as reference #37 is not related to the grid emission factor according to the list of references. In addition, please indicate the date of the publication and a confirmation that it was the most recent data available at the start of the validation.
2: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
The DOE is requested to provide date of publication for the reference used for the risk free rate of return.
3: The DOE is requested to report how it has validated the scope of the common practice analysis as per VVM v 1.2 paragraph 121 (a).
In particular, the DOE is requested to clarify the capacity range applied as section 4.6.6 point four mentions that wind farms with installed capacity below 15 MW were eliminated (validation report page 26) while Step 1 in the same page mentions that +/- 50% of the project capacity (10.8-32.3 MW) was applied.
1: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
In particular, please clarify the reference given for the grid emission factor (/37/) in page 30 of the validation report as reference #37 is not related to the grid emission factor according to the list of references. In addition, please indicate the date of the publication and a confirmation that it was the most recent data available at the start of the validation.
2: The DOE is requested to provide information on how it has validated the suitability of the benchmark as per VVM v 1.2 paragraph 114 (b).
The DOE is requested to provide date of publication for the reference used for the risk free rate of return.
3: The DOE is requested to report how it has validated the scope of the common practice analysis as per VVM v 1.2 paragraph 121 (a).
In particular, the DOE is requested to clarify the capacity range applied as section 4.6.6 point four mentions that wind farms with installed capacity below 15 MW were eliminated (validation report page 26) while Step 1 in the same page mentions that +/- 50% of the project capacity (10.8-32.3 MW) was applied.