Info Report Check
Submission incomplete:
1: The PP/DOE are requested to explain the methodological choices for the calculation of the baseline, project emissions and emission reductions as per EB 48 Annex 60 paragraph 10 (a).
As per information on page 24 of the PDD, the project undertook the measurement campaign for wastewater COD entering to open lagoon during 21 July – 3 Aug 2006. The average of the measurement campaign is 17,983 mg/l multiplied by 0.89. However as per Annex 5 of the PDD, the measurement campaign for wastewater COD entering to open lagoon was done during 16 March - 25 March 2006 and 1 April – 5 April 2006. The average of the measurement campaign is 14,739 mg/l multiplied by 0.89. PDD does not include consistent information.

2: The PP/DOE are requested to list all the data and parameters to be monitored in line with applied methodology as per EB 48 Annex 60 paragraph 10 (a).
Net quantity of thermal energy supplied by project activity is not included in monitoring plan in the PDD although this is required as per paragraph 50 of methodology AMS I.C., version 19.