Info Report Check
Submission incomplete:
1: The DOE is requested to describe all the assumptions/ data/references listed in the PDD for the baseline identification as per VVM v1.2 paragraph 87 (a).
According to the Validation Report the OM is calculated using data from 2006 ~ 2008 and the build margin (BM) with data from 2007 (VR, pg 17). Since data from 2008 appears to be available for the BM, please clarify how year 2007 was validated as the most appropriate for the BM.
Additionally, the DOE has explained that the approximate operating margin is calculated as the average of data for years 2006, 2007 and 2008, which is the most recent available statistics at the time of preparation of the initial PDD. Please clarify the date of publication of the data source (Statistic of Electric Power in Korea by KEPCO), and how it was validated that the source was the most recent available at the time of initial PDD preparation.
2: The DOE is requested to describe how the data/parameters used in the equations were verified as per VVM v1.2 paragraph 93.
It is not described by the DOE how it was verified the average annual power generation (3,331 MWh per year). Please, provide further explanation about the verification of this data.
3: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
4: The DOE is requested to provide information on the PPs' ability to implement the monitoring plan as per VVM v1.2 paragraph 124(c).
1: The DOE is requested to describe all the assumptions/ data/references listed in the PDD for the baseline identification as per VVM v1.2 paragraph 87 (a).
According to the Validation Report the OM is calculated using data from 2006 ~ 2008 and the build margin (BM) with data from 2007 (VR, pg 17). Since data from 2008 appears to be available for the BM, please clarify how year 2007 was validated as the most appropriate for the BM.
Additionally, the DOE has explained that the approximate operating margin is calculated as the average of data for years 2006, 2007 and 2008, which is the most recent available statistics at the time of preparation of the initial PDD. Please clarify the date of publication of the data source (Statistic of Electric Power in Korea by KEPCO), and how it was validated that the source was the most recent available at the time of initial PDD preparation.
2: The DOE is requested to describe how the data/parameters used in the equations were verified as per VVM v1.2 paragraph 93.
It is not described by the DOE how it was verified the average annual power generation (3,331 MWh per year). Please, provide further explanation about the verification of this data.
3: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
4: The DOE is requested to provide information on the PPs' ability to implement the monitoring plan as per VVM v1.2 paragraph 124(c).