Submission incomplete:
The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The resubmitted PDD excludes the parameters Biomass Expansion factor (BEF) and Basic wood density (Dj) from the table B.8.1.1.1. However, neither the PDD nor the TARAM spreadsheet provide the ex-ante values of the two parameters.
The PP/DOE are requested to choose of the following options;
a) provide validated ex-ante values of BEF and Dj in the PDD and the validation report, OR
b) include the two parameters in the monitoring table in the PDD stating that they will be estimated once from the sample plots, and the used for the entire crediting period. In case option b) is chosen, the PP/DOE is requested to remove the statement in page 32 of the PDD that states, '' The same values for BEF2,j and Dj should be used in the ex post and in the ex ante calculations''.
The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The resubmitted PDD excludes the parameters Biomass Expansion factor (BEF) and Basic wood density (Dj) from the table B.8.1.1.1. However, neither the PDD nor the TARAM spreadsheet provide the ex-ante values of the two parameters.
The PP/DOE are requested to choose of the following options;
a) provide validated ex-ante values of BEF and Dj in the PDD and the validation report, OR
b) include the two parameters in the monitoring table in the PDD stating that they will be estimated once from the sample plots, and the used for the entire crediting period. In case option b) is chosen, the PP/DOE is requested to remove the statement in page 32 of the PDD that states, '' The same values for BEF2,j and Dj should be used in the ex post and in the ex ante calculations''.