1: The DOE is requested to state if the baseline methodology is correctly applied to calculate project/baseline emissions, leakage and emission reductions as per VVM v1.2 paragraph 92(d).
In doing so, the PP/DOE are requested to provide information justifying the length of the heating season (149 days), the heat demand (57.35 w/m2) and the total carpet area, Aj,I, (4.47 million m2) as required by the AM0058 v.3 approved methodology (page 5 ).

2: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
In doing so the DOE is requested to i) provide a breakdown of the major equipment costs, required construction work and installation of the total investment cost, ii) clarify why the total carpet area, Aj,I, of 4.47 million m2 and the investment cost for the boiler house of 11.24 million RMB (alternative 2(a)) were taken into account considering that the methodology applies for the existing buildings, and ii) provide information from public, official publications from a government body or from international market prices etc to substatiate the cost of fuel purchase as required by the methodology (page 8).

3: The DOE is requested to include information on how it has validated sensitivity analysis of the investment analysis as per VVM v1.2 paragraph 111 (e).
In doing so, the DOE is requested to provide information justifying the exclusion of the heat generation parameter from the sensitivity analysis

4: The DOE is requested to provide information on how it has assessed each barrier presented as per VVM v 1.2 paragraph 118 (a) and (b).
In doing so, the DOE is requested to provide qualitative or quantitative augments to show how the registration of the CDM project activity will alleviate the barriers that prevent the proposed project activity from occurring in the absence of CDM.

5: The DOE is requested to report how it has validated the scope of the common practice analysis as per VVM v 1.2 paragraph 121 (a).
In doing so, the DOE is requested to provide information supporting the justification on the applicable geographical area selected for demonstrating that the project activity is First-of-its-kind.