Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The PP is requested to clearly include the calibration frequency of electricity meters.

2: The DOE is requested to describe the steps taken to assess the equations applied to calculate the project emissions as per the chosen methodology (VVM v1.2 paragraph 92).
The DOE is requested to explain how it validated that the power density of the proposed project activity is higher than 10 W/m2. In doing this, the DOE shall explain how it assessed that "the existing riverbed area" complies with the definition of "existing reservoir" as per ACM 0002 version 13.0.0.

3: The DOE is requested to provide information on the steps taken to validate the project starting date as per VVM v 1.2 paragraph 104 (a).
In particular, the DOE shall explain how it validated the starting date based on the "first construction contract" dated on 26/07/2010 given that in the reference list in the Validation Report, it appears that the "Equipment purchasing contract " was signed before.


4: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
The DOE is requested to explain how it cross-checked the parameters assumed in the investment analysis. In particular, (i) the total investment, (ii) the operation and maintenance costs, (iii) the electricity tariff and (iv) the annual electricity output of the project activity.
The DOE is also requested to explain how the electricity tariff assumed in the Modified FSR is based on Decision 73/QD-DTDL and 18/2008/QD-BCT dated on 2009 and 2008, given that Decision 588/QD-BTC was dated on 22/03/2010, prior to the date of modification of the FSR.

5: The DOE is requested to identify if the FSR has been the basis of the investment decision as per VVM v 1.2 paragraph 113 (a).
The DOE is requested to clarify whether the modified FSR has been duly approved by the relevant authorities.

6: The DOE is requested to provide confirmation that the values used in PDD are fully consistent with the FSR as per VVM v 1.2 paragraph 113 (b).
In doing this, the DOE is requested to (i) provide the input values considered in the original FSR (dated 03/2008) and (iii) to explain how it validated that the modifications assumed are adequate and applicable to the proposed project activity.

7: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
In particular, the DOE is requested to describe how it assessed that the area of the parameter Apj will be adequately monitored as required by the methodology.

8: The DOE is requested to describe the steps taken to assess the adequacy of the local stakeholder consultation as per VVM v1.2 paragraph 130(a).
In particular, the DOE is requested to provide information on how it assessed that (i) all relevant stakeholders were invited, (ii) the summary of the comments received as provided in the PDD is complete and (iii) that the PPs have taken due account of any comments received.