Submission incomplete:
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
It is requested to provide the technical details of the generator.

2: The PP/DOE are requested to list the data and parameters used to calculate the emission reductions as per EB 48 Annex 60 paragraph 10 (a).
The raw data and detailed calculation of the combined margin calculation are not provided. The PP/DOE are requested to submit the raw data and detailed calculation used in the combined margin calculation in a spreadsheet.

3: The DOE is requested to include validation opinion on the accuracy and completeness of the project description in the validation report as per VVM v1.2 paragraph 64(b).
It is requested to clarify how the DOE validate the completeness of the project description without information about the generators.

4: The DOE is requested to describe how each applicability condition of the methodology/ies is fulfilled by the project activity as per VVM v1.2 paragraph 76.
The capacity is determined based on the turbine, not generator. Even with the generator capacity, the project activity may fall under small scale threshold (15 MW). However, it is requested to provide the exact capacity based on the generators.

5: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
It is requested to clarify i) how the DOE validated the inclusion of financial cost during construction is appropriate in the calculation of project IRR and ii) whether separate transmission line is constructed for phase I and phase II and how the cost for construction of new transmission line is estimated for each phase.