The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
The DOE is requested to assess the baseline scenario for the “greenfield facilities” in line with the Clarification provided by EB 61,Annex 5 .The DOE should in order to determine the baseline scenario : 1.Identify alternative design options for the clinker facility along with the feasible usage of the waste energy for those designs (with/without waste heat recovery component /with a waste heat recovery component of a different denomination) that was available to the PP. 2.Undertake an investment analysis for the identified alternative designs to the entire greenfield facility for the determination of the baseline scenario In doing so,please refer to Clarification “AM_CLA_0219”